Parking Lot Snow Removal
- Parking Lot Schedule:
- All work will be completed between 18:00 and 09:00.
- All properties shall be pushed and piled within 24 hours of the end of a snowfall.
- Sanding will occur within 24 hours of clearings.
- Hauling will occur at least once per month during months with 1 or more push & piles.
- Push & Pile/Haul:
- After a recorded snowfall accumulation within any 48-hour period equal to the threshold noted under the push price, all loose snow in “parking lot areas” shall be pushed and piled to designated locations within the scheduled times.
- The contract includes all automatic push & piles and all call outs for excessive accumulation drifting, melting or accessibility.
- Sanding | Salting | Pickled Sand:
- Sanding will occur automatically after each push & pile, scraping, rainfall, or refreeze event.
- The contract for monthly includes all automatic sanding’s, all call-outs, and all sandbox fills.
- Snowpack Scraping:
- Snowpack Scraping will automatically occur during mild weather greater than -10°C and between snowfalls when the snowpack reaches at least 5cm thickness.
Wheel Loader
Available Equipment:
-
- Skid Steer
- Plow Truck
- Tandem Dump
- End Dump
- Wheel Loader
Parking Lot Equipment
Sidewalk Snow Removal
Sidewalk Snow Removal
- After each snow fall event of 1cm or more, clearing snow will occur within 24 hours to a maximum of once every 24 hours.
- Salting and Sanding included.
- Work will be completed between 18:00 and 09:00
- Monthly rates only and must be in conjunction with a parking lot push & pile/haul contract.